| Status: |
DREDGE COMPLETED/Continue storing sand |
| Initial Funding: |
January 18, 2017 |
| Estimated Completion: |
December 2021 |
| Description: |
A severe storm event in 2017 caused part of the boat launch ramps to be covered in sand very rapidly. The cost of the removal of debris/sediment and storage of the sand to be used to replenish Surfers Beach/West Trail was deemed to be qualified for FEMA/CalOES Funding. |
| Justification: |
The Boat Launch Ramp contains six lanes. The sand accumulation caused two of the six lanes to become nonoperational. This has led to long waiting periods to launch boats. |
| Strategic Goat/Operating Impact: |
1) Comprehensive Long-Range Planning Guides District Actions and Decision Making. |
| |
2) Infrastructure Improvements are Guided by Comprehensive Long Term Planning. |